The Shannon One Design on Irish television

My thanks to Ginny Jones of Vineyard Sailing for spotting these videos about building and sailing these lovely clinker-built racing dinghies. Read more about them here and here.

As usual with these things, I want to have a go at sailing one – preferably this summer in a perfect breeze among lush green landscape and an sun twinkling on that Irish river water… One day!

RLYC launch Mary likely to launch in late spring, Ben Wales reports

Ben Wales has been in touch to report on the steady progress he and friends have made on restorating of the clinker-built 18ft former Royal Lymington Yacht Club motor launch Mary, which was used in Operation Dynamo, otherwise known as the evacuation of Dunkirk in 1940.

Ben and his helpers have been working out of doors until recently, but I’m pleased to say a car port tent has made all the difference.

Here’s what he says:

‘Hello Gavin,

‘Since the Summer we have completed the work in renewing the engine beds and installed one new floor – the original beds were hard-nailed to the bilge planking, which was far from ideal. The new engine beds are now braced with brackets, and are a better fit than the originals.

‘The project had to be put on hold for a few weeks in late August as the weather was too hot and sunny for working on the boat.

‘The next phase of work was to fit new forward and aft bulkheads, and rather than fitting these in the same way as before (screwed to the topside planking) we riveted and screwed them top and bottom. We also made them up in tongue and groove planking to provide stronger bulkheads than previously.

‘In November we were given permission to erect a car port tent over the launch and were able to work up to mid-December, when we had to take down the cover because it was taking a battering from the high winds we have been having.

‘However, we did manage to pre-steam the main rubbing strakes and then fit the top port-side rubbing strake before the weather stopped our work.

‘We hope to resume work in February, when we hope to start laying a new deck and complete the final fit-out ready for what hope will be a late spring relaunch.

‘I will advise you further progress news in the New Year.

‘Regards, Ben’

A trip to the Plymouth Breakwater

They must have a different kind of sea at Plymouth – for at the end of November, just a couple of weeks ago, fearless Will Stirling actually went swimming in it and survived, as the photos above show. Ugh!

Here’s what Will has to say about the escapade:

‘We visited the breakwater in the summer in our new expedition dinghy.

‘Our anchor fouled and I had to swim out to the boat and cut the rope. Last week we recovered the anchor which had become caught under a rock but was none the worse after four months in Mr D Jones’ locker.

‘Best wishes, Will’

Will reports that the construction of Plymouth Breakwater began in 1812 and completed in 1841. It is 1,560 metres long, 13 metres wide at the top and 65 metres at the base, lies in about 10 metres of water and is composed of 4 million tons of rock.

The beacon on the Eastern End has a spherical steel cage on top that can accomodate six shipwrecked sailors – though Will is dubious about the the benefits of dying slowly from exposure in the cage rather than dying quickly by drowning.

Thanks for the photos and the story Will!

Traditional yacht Builders and wooden boat repairers Stirling and Son Ltd are at the No 1 Covered Slip, South Yard, Devonport, Plymouth and has a website at www.stirlingandson.co.uk. The 14ft Expedition dinghy is one of the company’s range of handsome clinker-built dinghies.