The Boat Building Academy celebrated the launch of six boats and seventeen new boat builders at Lyme a few weeks ago.
The boats were built by the BBA’s class of September 2013, who had completed its 38-week course. Although new to woodworking and boat building, the students built six boats and a paddle board using modern and traditional methods, completing every step from lofting board to launch in just nine months.
Some three hundred well-wishers gathered in the sunshine to celebrate the students’ achievements and give a resounding cheer as the champagne popped and each boat went into the water.
First in was the 12ft traditional clinker dinghy above, built by David Rainbow and Adam Smith to Paul Gartside’s 2001 design, #130 design, and planked in west African mahogany on oak ribs and backbone. (The photos are by Liz Griffiths, Becky Joseph, Jenny Steer, and John Pritchard.)
David, from Middlesex, worked at Heathrow Airport for 20 years in a variety of roles, most recently as baggage operational assurance manager, and first came to the BBA to do a three-day introductory course, and then decided it was time for a change of career and booked a place on the 38-week course last year.
David chose to build this row and sail boat as he felt the traditional clinker method would make a good test of skills, and felt the style and size of this particular Paul Gartside design was just right for him.
He made a couple of changes to the original design – he planked it in West African mahogany rather than western red cedar for aesthetic reasons, and chose a boomless standing lug rig designed by Paul Gartside specifically for David’s boat, rather than the original boomed rig.
Named Enfys – the Welsh word for ‘rainbow’ after David’s surname and his wife’s welsh roots – the boat is to be sailed on a lake at Hillingdon Outdoor Activity Centre, which is close to where David lives.
Adam Smith, originally from Canada, was David’s main build partner.
He was working with computers, but built a Selway Fisher dinghy in his spare time and enjoyed the process so much he decided to train for a new career. Adam made the most of the academy’s facilities and in his spare time on the course he made a cabinet, trestle table and chest. His latest spare-time project now that the course has finished is a strip-planked canoe.
Both David and Adam are start work in jobs on the Thames after a short break.